How to write a snagging report that gets things fixed
What to put on the first page, how to describe each snag, how to order the report, and what to do when the work is done.
· 3 min read · Powered By Thistle
A snagging report has a simple job: make it easy for someone else to fix a long list of small problems. The more clearly it's written, the faster the work gets done and the fewer arguments there are about what was found. Here's how to write one people actually act on.
Start with a one-page summary
The first page is for the person who will never read the rest, such as the client or the site manager. It should say:
- the address or project, and the date of the inspection
- who carried it out
- how many snags there are in total
- how many are urgent
- which rooms or areas have the most
- a line on overall condition, in plain words
If a reader stops after page one, they should still know how big the job is.
Group by room
Fixers work one space at a time, so a report that jumps between kitchen, loft and bedroom means they keep walking back and forth. Group snags by room or area, in the order someone would walk through the building, and number them.
Write each snag so it can't be misread
For every item, you want:
- A photo. A close-up of the problem, and a wider one if the location isn't obvious.
- A location. "Kitchen, window wall, left of the sink", not "kitchen".
- A description. One short, plain sentence. "Chipped worktop edge, about 3 cm", not "damaged worktop".
- A priority. Urgent, normal or cosmetic.
- Who fixes it. The trade or the company, so it goes to the right person.
- A fix-by date. Or a note of when the work is needed.
Mark up the photo if it helps: a circle round the defect, an arrow, a measurement. If you pin the snag on a floor plan, the report can show exactly where it is.
Keep your language neutral
You're recording facts, not passing judgement.
- Say what you see. "Gap of 4 mm along the skirting by the door", not "poor workmanship".
- Avoid blame. The report should be about the work, not the person.
- Don't speculate about causes unless you're qualified to. "Damp patch, 20 cm wide, ceiling above the bathroom" is a fact. "Leaking roof" is a guess.
- Report safety issues separately and straight away.
Make it look professional
It helps if the report carries your name or company, your logo, the date and a signature. It also helps if the photos are clear and the same size, and the pages are in a sensible order. People take a tidy report more seriously, and they find things in it faster.
Send it promptly
A report sent the same day, while the site is fresh in everyone's mind, gets a better response than one sent a week later. Ideally you send it before you leave, from the site.
Agree dates, then follow up
A list without dates tends to sit. When you send the report, ask for a date by which each item, or each group of items, will be fixed. Put your own date in the diary to check.
Re-inspect and show the result
When the work is done, go back. For each snag, take an after photo and mark it fixed. A report that shows before and after, side by side, closes the job cleanly and protects you if anyone asks later what was done.
Keep the original
Don't edit the first report. Keep it as it was, and record the changes in a new version or a status column. If there's ever a dispute, you can show what was found, when, and what happened next.
A tool for the whole thing
SnagLine is built around that loop. You photograph and mark up each snag on site, pin it on a plan, group it by room, add who's responsible and a fix-by date, and send a branded PDF before you leave. On re-inspection you mark snags fixed with an after photo and the report shows before and after. See the page for landlords and inspectors and the page for tradespeople.
For what to check in the first place, there's a new-build snagging checklist, and a short explainer on snag lists and punch lists.
Questions people ask
- What should a snagging report include?
- A summary page, then snags grouped by room. For each snag: a photo, the location, a short description, the priority, who is responsible and the date it should be fixed by.
- How should I order the snags?
- Group them by room or area so the person fixing them can work through one space at a time, and mark urgent ones clearly so they aren't buried.
- How long should a snagging report be?
- As long as it needs to be, but easy to scan. A summary page and one entry per snag, with a photo, is better than long paragraphs.
- What happens after the report is sent?
- Agree dates for the fixes, then re-inspect. Record each snag as fixed with an after photo, so you can show what was done.
More from the notebook
- 23 October 2026Guide
New-build snagging checklist: room by room
A practical room-by-room checklist for snagging a new-build home in the UK, what paperwork to ask for, and how to report what you find.
- 23 October 2026Guide
Snag list or punch list? What's the difference?
Snag list, snagging list, punch list and defects list all mean much the same thing. Here's where each term is used, and what a good list contains.